Skip To Main Content
Thompson School District Bond Projects

Berthoud Elementary School

Front of Berthoud Elementary School

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Berthoud Elementary School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$590K

  • Asphalt
  • Grounds
  • HVAC
  • Plumbing
  • Fire Protection
  • Security Systems

2018 Bond
(2018-2025)

$5M

  • Asphalt
  • Environmental
  • Flooring
  • Grounds
  • Playground
  • Plumbing
  • Fire Protection
  • Security Systems
  • Classroom Additions
  • Modernization

2025 Bond
(2025–2030)

$19M*

  • HVAC (Cool Existing Building)
  • Main Entry (Exterior Refresh)
  • Addition Planned
  • Renovate Existing Building
  • Preschool Inclusion
  • Reconfigure:  Four classes per grade (K-5)
  • Student Drop Off Upgrades
  • Security Vestibule

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

School front entrance with double glass doors and no secure vestibule

Berthoud Elementary requires a modified secure vestibule be constructed to monitor visitors as they access the building.

View of parking lot with visible cracks and uneven pavement

Cracked and uneven pavement in the Berthoud Elementary parking lot requires repair to improve safety and accessibility.