Berthoud Elementary School

2025 Bond
Your Tax Dollars at Work at Berthoud Elementary School
- Critical Needs
- Safety and Security
- Future Planning
2005 Bond
(2005-2012)
$590K
- Asphalt
- Grounds
- HVAC
- Plumbing
- Fire Protection
- Security Systems
2018 Bond
(2018-2025)
$5M
- Asphalt
- Environmental
- Flooring
- Grounds
- Playground
- Plumbing
- Fire Protection
- Security Systems
- Classroom Additions
- Modernization
2025 Bond
(2025–2030)
$19M*
- HVAC (Cool Existing Building)
- Main Entry (Exterior Refresh)
- Addition Planned
- Renovate Existing Building
- Preschool Inclusion
- Reconfigure: Four classes per grade (K-5)
- Student Drop Off Upgrades
- Security Vestibule
Examples of Critical Needs

Berthoud Elementary requires a modified secure vestibule be constructed to monitor visitors as they access the building.

Cracked and uneven pavement in the Berthoud Elementary parking lot requires repair to improve safety and accessibility.