Skip To Main Content
Thompson School District Bond Projects

Big Thompson Elementary School

Exterior of Big Thompson Elementary School, a red brick building with a stone sign in front

School Programs

  • Science, Technology, Engineering, and Mathematics (STEM)
  • EL Education

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Big Thompson Elementary School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$500K

  • Asphalt
  • Grounds
  • HVAC
  • Lighting
  • Plumbing
  • Fire Protection
  • Security Systems

2018 Bond
(2018-2025)

$2.1M

  • Environmental
  • Flooring
  • Grounds
  • HVAC
  • Kitchen Equipment
  • Plumbing
  • Roof
  • Doors/Hardware
  • Security Systems
  • Modernization

2025 Bond
(2025-2030)

$1.98M*

  • HVAC
  • Roof (Repair/Replacement)
  • Walls (Exterior Brick)
  • Security Vestibule

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Cracked red brick wall with a jagged vertical crack running from the roof down past a window and doorway

Visible stair-step crack in exterior brickwork at Big Thompson Elementary School, extending from the roofline down past a second-story window.

Large rooftop HVAC unit with visible wear on gravel-covered roof

The aging rooftop unit at Big Thompson Elementary requires replacement to ensure reliable climate control and energy efficiency.

Rooftop HVAC units and piping on gravel roof with surrounding hills in background

Roofing system at Big Thompson Elementary shows areas of wear requiring upgrades to avoid leaking.