Big Thompson Elementary School

School Programs
- Science, Technology, Engineering, and Mathematics (STEM)
- EL Education
2025 Bond
Your Tax Dollars at Work at Big Thompson Elementary School
- Critical Needs
- Safety and Security
- Future Planning
2005 Bond
(2005-2012)
$500K
- Asphalt
- Grounds
- HVAC
- Lighting
- Plumbing
- Fire Protection
- Security Systems
2018 Bond
(2018-2025)
$2.1M
- Environmental
- Flooring
- Grounds
- HVAC
- Kitchen Equipment
- Plumbing
- Roof
- Doors/Hardware
- Security Systems
- Modernization
2025 Bond
(2025-2030)
$1.98M*
- HVAC
- Roof (Repair/Replacement)
- Walls (Exterior Brick)
- Security Vestibule
Examples of Critical Needs

Visible stair-step crack in exterior brickwork at Big Thompson Elementary School, extending from the roofline down past a second-story window.

The aging rooftop unit at Big Thompson Elementary requires replacement to ensure reliable climate control and energy efficiency.

Roofing system at Big Thompson Elementary shows areas of wear requiring upgrades to avoid leaking.
