Skip To Main Content
Thompson School District Bond Projects

Carrie Martin Elementary School

Exterior of Carrie Martin Elementary School with blue trim, brick walls, and a flagpole

School Programs

  • Leader in Me

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Carrie Martin Elementary School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$300K

  • Plumbing
  • Kitchen Equipment
  • Asphalt
  • Security Systems
  • HVAC

2018 Bond
(2018-2025)

$2M

  • Roof
  • Modernization
  • Security Systems
  • Doors/Hardware
  • Kitchen Equipment
  • Flooring
  • Environmental
  • Grounds
  • HVAC

2025 Bond
(2025-2030)

$724.9K*

  • Asphalt
  • Kitchen Equipment
  • Roof (Overhangs/Soffits)
  • Security Vestibule

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Blue metal roof overhang with damaged soffit above brick wall

Damaged soffits at Carrie Martin Elementary roof overhang need repair to prevent water intrusion and deterioration.

School kitchen with stainless steel counters and industrial dishwasher

Outdated kitchen equipment is due for replacement.

Outdoor basketball court with painted U.S. map and large cracks in asphalt

Cracked asphalt in Carrie Martin Elementary play area needs resurfacing to improve safety and usability.