Skip To Main Content
Thompson School District Bond Projects

Cottonwood Plains Elementary School

Exterior of Cottonwood Plains Elementary School with brick walls, canopy entrance, and trees

School Programs

  • Dual Language Immersion

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at
Cottonwood Plains Elementary School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$560K

  • Playground
  • Asphalt
  • HVAC
  • Plumbing

2018 Bond
(2018-2025)

$2.5M

  • Roof
  • Modernization
  • Grounds
  • Playground
  • Security Systems
  • Security Vestibule
  • Environmental
  • HVAC

2025 Proposed Bond
(2025-2030)

$825,000*

  • Grounds (Privacy Walls)
  • Flooring 
  • Plumbing
  • Walls (Enclose Kiln)
  • Windows
  • Doors/Hardware

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Exposed kitchen piping with worn insulation above floor mats and wall vent

The exposed kitchen piping at Cottonwood Plains Elementary needs to be rerouted for safety and efficiency.

School window with four glass panes framed in black metal next to gray door

Deteriorating windows and frames at Cottonwood Plains Elementary need replacement for better energy efficiency.