Skip To Main Content
Thompson School District Bond Projects

Coyote Ridge Elementary School

Aerial shot of Coyote Ridge Elementary School

School Programs

  • International Baccalaureate

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Coyote Ridge Elementary School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$9.8M

  • Coyote Ridge Elementary School opened
  • Addition

2018 Bond
(2018-2025)

$1M

  • Roof
  • Modernization
  • Fire Protection
  • Asphalt
  • Security Systems
  • Security Vestibule
  • Flooring
  • Lighting

2025 Proposed Bond
(2025-2030)

$735,900*

  • Electrical (Controls)
  • HVAC (Major Equipment)
  • Wall (Exterior Masonry)

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Multiple outdated light switch panels on a wall at Coyote Ridge Elementary School.

Coyote Ridge Elementary School needs lighting system control upgrades for efficiency.

HVAC equipment such as the chiller shown, are aged and in need of replacement for efficiency.