Skip To Main Content
Thompson School District Bond Projects

Ivy Stockwell Elementary School

Front of Ivy Stockwell Elementary School

School Programs

  • Science, Technology, Engineering, and Mathematics (STEM)

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Ivy Stockwell Elementary School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$610K

  • Asphalt
  • HVAC
  • Lighting
  • Plumbing
  • Grounds
  • Roof

2018 Bond
(2018-2025)

$4.6M

  • Roof
  • Modernization
  • Classroom Additions
  • Asphalt
  • Grounds
  • Playground
  • Fire Protection
  • Flooring
  • Plumbing
  • Security Systems

2025 Proposed Bond
(2025-2030)

$22,950,000*

  • Reconfigure: Four classes per grade (K-5)
  • HVAC (Cool Existing Building)
  • Main Entry (Exterior Refresh)
  • Addition Planned
  • New Gymnasium
  • Renovate Existing Building
  • Preschool Inclusion
  • Student Drop Off Upgrades
  • Security Vestibule

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

School entrance doors leading directly into building interior without secure vestibule

Ivy Stockwell Elementary requires the construction of a secure vestibule to monitor visitors to the building.

Cracked and uneven concrete walkway near school entrance

Damaged concrete at Ivy Stockwell Elementary needs repair to improve safety and accessibility.