Ivy Stockwell Elementary School

School Programs
- Science, Technology, Engineering, and Mathematics (STEM)
2025 Bond
Your Tax Dollars at Work at Ivy Stockwell Elementary School
- Critical Needs
- Safety and Security
- Future Planning
2005 Bond
(2005-2012)
$610K
- Asphalt
- HVAC
- Lighting
- Plumbing
- Grounds
- Roof
2018 Bond
(2018-2025)
$4.6M
- Roof
- Modernization
- Classroom Additions
- Asphalt
- Grounds
- Playground
- Fire Protection
- Flooring
- Plumbing
- Security Systems
2025 Proposed Bond
(2025-2030)
$22,950,000*
- Reconfigure: Four classes per grade (K-5)
- HVAC (Cool Existing Building)
- Main Entry (Exterior Refresh)
- Addition Planned
- New Gymnasium
- Renovate Existing Building
- Preschool Inclusion
- Student Drop Off Upgrades
- Security Vestibule
Examples of Critical Needs

Ivy Stockwell Elementary requires the construction of a secure vestibule to monitor visitors to the building.

Damaged concrete at Ivy Stockwell Elementary needs repair to improve safety and accessibility.