Thompson School District Bond Projects

Laurene Edmondson Elementary School

Exterior of Laurene Edmondson Elementary School with a STEM banner on the brick building

School Programs

  • Science, Technology, Engineering, and Mathematics (STEM)

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at
Laurene Edmondson Elementary School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$780K

  • Fire Protection
  • HVAC
  • Flooring
  • Lighting
  • Asphalt
  • Doors/Hardware

2018 Bond
(2018-2025)

$2.5M

  • Roof
  • Modernization
  • Environmental
  • Asphalt
  • Grounds
  • Kitchen Equipment
  • HVAC
  • Lighting
  • Athletics
  • Security Systems

2025 Proposed Bond
(2025-2030)

$915,200*

  • HVAC (Controls, Equipment)
  • Grounds (Concrete)
  • Plumbing
  • Security Vestibule

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Red water heater tank with connected pipes and gauges in mechanical room

The outdated pumps at Laurene Edmondson Elementary should be replaced to improve performance and reliability.

Open electrical control panel with wiring, circuit components, and network modules mounted inside a gray metal cabinet

HVAC controls at the school need upgraded to ensure reliable building operations and energy efficiency.