Thompson School District Bond Projects

Lincoln Elementary School

Exterior of Lincoln Elementary School with brick walls, flagpole, and Thompson School District sign

School Programs

  • Project-Based Learning

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Lincoln Elementary School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$820K

  • Fire Protection
  • Plumbing
  • Security Systems
  • HVAC
  • Asphalt

2018 Bond
(2018-2025)

$2.5M

  • Roof
  • Modernization
  • Environmental
  • Asphalt
  • Grounds
  • Kitchen Equipment
  • HVAC
  • Lighting
  • Athletics
  • Security Systems
  • Fire Protection

2025 Proposed Bond
(2025-2030)

$3,030,500*

  • Grounds (Playground)
  • HVAC (Major Equipment)
  • Doors/Hardware

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Bottom corner of exterior metal door with visible rust and paint damage.

Rusting exterior door bottom requires repair or replacement to maintain security and prevent further corrosion.

Worn rubber safety surface under swings and slide, surrounded by wood chips.

Deteriorating playground safety surface under swings and slide needs replacement to reduce trip hazards, protect students, and improve accessibility.

Concrete entryway with large sealed cracks leading to an exterior door.

Cracked and uneven entryway concrete needs permanent repair to improve safety and accessibility.