2025 Bond
Your Tax Dollars at Work at Sarah Milner Elementary School
- Critical Needs
- Safety and Security
- Future Planning
2005 Bond
(2005-2012)
$905K
- Improvements to Support Growth
- Asphalt
- HVAC
- Lighting
- Security Systems
- Fire Protection
- Plumbing
2018 Bond
(2018-2025)
$1.98M
- Roof
- Modernization
- Security Systems
- Environmental
- Playground
- HVAC
2025 Proposed Bond
(2025-2030)
$1,075,800*
- HVAC
- Roof (Repair Damage)
- Security Vestibule
Examples of Critical Needs

The school’s aging boiler system requires replacement to ensure reliable heating and energy efficiency.

Rooftop HVAC unit shows signs of weather damage and deterioration, indicating the need for repair or replacement.

The main entry is in need of a security vestibule to better monitor visitors and secure the building.