- Critical Needs
- Safety and Security
- Future Planning
2005 Bond
(2005-2012)
$5.3M
- Asphalt
- Athletics
- Flooring
- Grounds
- Roof
- Fire Protection
- Improvements to Support Growth
2018 Bond
(2018-2025)
$6M
- Modernization
- Athletics
- HVAC
- Auditorium
- Environmental
- Flooring
- Security Systems
- Security Vestibule
- Asphalt
- Roof
2025 Proposed Bond
(2025-2030)
$1,700,600*
- Gym (Equipment Repair)
- Auditorium (Equipment, Seats)
- Electrical
- HVAC (Controls, Equipment)
- Grounds
- Lighting (Controls, Equipment)
- Plumbing
- Roof
- Emergency Communication Equipment
- Security Systems (Stadium)
Examples of Critical Needs

Cracks in the concrete irrigation ditch near the school require repair to prevent further structural damage.

Sections of the school’s flat roof have wear and previous patchwork,requiring repairs.

Aging generator equipment shows corrosion and wear, highlighting the need for replacement to ensure reliable backup power.