2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Loveland High School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$7.5M

  • Plumbing
  • Flooring
  • Athletics
  • Fire Protection
  • Modernization

2018 Bond
(2018-2025)

$11.4M

  • Roof
  • Modernization
  • Environmental
  • Security Systems
  • Security Vestibule
  • Auditorium
  • HVAC
  • Athletics
  • Flooring

2025 Proposed Bond
(2025-2030)

$3,855,500*

  • Gym (Bleachers)
  • Auditorium (Wall, Equipment)
  • HVAC
  • Plumbing
  • Fire Protection (Equipment)
  • Roof (Major Repairs/Replace)
  • Emergency Communication Equipment

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Worn and stained partition wall in auditorium with visible wear and outdated finish.

The auditorium partition wall shows significant wear and needs replacement or refurbishment.

Mounted fire alarm control panel with conduit and wiring along a cinderblock wall.

The fire alarm system is aging and should be updated.

Large exterior wood dust collection system with visible dirt and aging equipment.

The aging wood dust collection system requires maintenance or replacement to improve efficiency.