Thompson School District Bond Projects

Mountain View High School

Front of Mountain View High School

School Programs

  • Advanced Placement (AP)
  • Loveland-area Integrated School of the Arts (LISA)
  • Project Leading the Way (PLTW)
  • Next Gen Learning

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Mountain View High School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$8.4M

  • Improvements to Support Growth
  • Asphalt
  • Plumbing
  • HVAC
  • Doors/Hardware
  • Walls
  • Athletics

2018 Bond
(2018-2025)

$7.3M

  • Roof
  • Modernization
  • Security Systems
  • Kitchen Equipment
  • Fire Protection
  • HVAC
  • Auditorium
  • Lighting

2025 Proposed Bond
(2025-2030)

$852,500*

  • Pool (Lift)
  • Auditorium (Lights, Controls)
  • Electrical (Lighting Controls)
  • Grounds (Asphalt, Drainage)
  • Doors/Hardware

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Damaged grate cover on walkway by soccer field

The grate cover and asphalt path are damaged and uneven, posing safety risks for pedestrians.

Rusted pool lift chair beside swimming pool edge

The pool lift chair is rusted and worn, requiring replacement to maintain accessibility and safety.

Gray metal door labeled “Danger Acid” with rust along the edges, located in a pool mechanical room near a sink and safety equipment

The rusting acid storage room door in the pool mechanical area requires repair or replacement to maintain safety and prevent corrosion hazards.