2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Thompson Valley High School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$4.5M

  • Athletics
  • Roof
  • Flooring
  • HVAC
  • Improvements to Support Growth
  • Doors/Hardware
  • Lighting
  • Security Systems

2018 Bond
(2018-2025)

$11.8M

  • Roof
  • Modernization
  • Kitchen Equipment
  • Security Systems
  • Security Vestibule
  • Grounds
  • Doors/Hardware
  • Environmental
  • Fire Protection
  • Flooring
  • Auditorium
  • Asphalt

2025 Proposed Bond
(2025-2030)

$2,745,600*

  • Gym (Floor, Basketball Equipment)
  • Auditorium (Equipment)
  • Flooring
  • Grounds
  • HVAC (Major Equipment)
  • Lighting
  • Plumbing
  • Fire Protection
  • Emergency Communication Equipment

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Row of white wall-mounted sinks in a restroom with worn tile walls and mirror edges.

Outdated restrooms require various upgrades/repairs.  

Large circular utility sink in a maintenance room with hoses, cleaning supplies, and signs of wear.

Aging utility sinks need to be replaced due to failed components to improve operation. 

Wall-mounted fire alarm control panel with wiring and conduit.

Aging Fire alarm system requires modernization.