Bill Reed Middle School

School Programs
- Loveland-area Integrated School of the Arts
- Dual Language Immersion
2025 Bond
Your Tax Dollars at Work at Bill Reed Middle School
- Critical Needs
- Safety and Security
- Future Planning
2005 Bond
(2005-2012)
$1M
- Asphalt
- Flooring
- HVAC
- Plumbing
- Roof
- Fire Protection
2018 Bond
(2018-2025)
$3.2M
- Asphalt
- Environmental
- Flooring
- HVAC
- Playground
- Roof
- Security Systems
- Modernization
2025 Proposed Bond
(2025-2030)
$6,710,625*
- Auditorium (Equipment)
- Flooring
- Grounds (Drainage)
- HVAC
- Roof
- Windows
- Emergency Communication Equipment
- Security Vestibule
Examples of Critical Needs

Severely cracked and lifting cafeteria floor tiles create safety hazards and require replacement.

Cracked and uneven concrete near the track’s drainage area needs repair to improve safety and accessibility.
