2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Bill Reed Middle School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$1M

  • Asphalt
  • Flooring
  • HVAC
  • Plumbing
  • Roof
  • Fire Protection

2018 Bond
(2018-2025)

$3.2M

  • Asphalt
  • Environmental
  • Flooring
  • HVAC
  • Playground
  • Roof
  • Security Systems
  • Modernization

2025 Proposed Bond
(2025-2030)

$6,710,625*

  • Auditorium (Equipment)
  • Flooring
  • Grounds (Drainage)
  • HVAC
  • Roof
  • Windows
  • Emergency Communication Equipment
  • Security Vestibule

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Close-up of brown cafeteria floor tiles with deep cracks, chips, and lifting edges.

Severely cracked and lifting cafeteria floor tiles create safety hazards and require replacement.

Cracked concrete sidewalk near a storm drain and running track, with uneven surface.