Lucile Erwin Middle School

School Programs
- International Baccalaureate
- Dual Language Immersion
2025 Bond
Your Tax Dollars at Work at Lucile Erwin Middle School
- Critical Needs
- Safety and Security
- Future Planning
2005 Bond
(2005-2012)
$700K
- Athletics
- Grounds
- Lighting
- Asphalt
- HVAC
2018 Bond
(2018-2025)
$3.3M
- Roof
- Modernization
- Security Systems
- Doors/Hardware
- Kitchen Equipment
- Flooring
- HVAC
- Lighting
2025 Proposed Bond
(2025-2030)
$940,500*
- Gym (Bleacher Upgrades)
- Electrical (Equipment)
- Flooring
- Grounds (Drainage)
- Walls (Exterior Stucco)
- Security Vestibule
- Emergency Communication Equipment
Examples of Critical Needs

Drainage issues near the playpad area cause water pooling and overgrown grass, impacting safety and usability.

Stucco on the building’s exterior shows cracking and staining, indicating wear and the need for repairs.

Damaged VCT flooring in the cafeteria presents tripping hazards and needs replacement.
