Thompson School District Bond Projects

Turner Middle School

Front of Turner Middle School

School Programs

  • Science, Technology, Engineering, and Mathematics (STEM)

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Turner Middle School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$3M

  • Athletics
  • Security Systems
  • HVAC
  • Plumbing
  • Roof
  • Doors/Hardware
  • Modernization

2018 Bond
(2018-2025)

$4.3M

  • Roof
  • Modernization
  • Security Systems
  • Security Vestibule
  • Grounds
  • Environmental
  • Fire Protection
  • Flooring
  • Asphalt
  • HVAC
  • Lighting

2025 Proposed Bond
(2025-2030)

$2,139,500*

  • HVAC (Equipment, Controls)
  • Roof (Shingles/Sections)
  • Doors/Hardware
  • Emergency Communication Equipment

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

School building exterior with brown shingle mansard and visible missing shingles.

Turner Middle School mansard roof with missing shingles requiring repair.

Large rusted rooftop HVAC unit with peeling paint and corrosion.

The corroded rooftop HVAC system at Turner Middle School in need of replacement.

Old rusted mechanical fan unit inside a dimly lit equipment room.

The aging mechanical fan unit at Turner Middle School is showing signs of heavy wear and disrepair.