Skip To Main Content
Thompson School District Bond Projects

Walt Clark Middle School

Exterior of Clark Middle School with %22Cougars%22 sign and cougar mascot above the main entrance

School Programs

  • Science, Technology, Engineering, and Mathematics (STEM)
  • Advancement Via Individual Determination (AVID)

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Walt Clark Middle School

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$1.1M

  • Security Systems
  • Lighting
  • Fire Protection
  • Plumbing
  • Flooring
  • Athletics

2018 Bond
(2018-2025)

$4.4M

  • Roof
  • Modernization
  • Security Systems
  • Environmental
  • HVAC
  • Asphalt
  • Flooring

2025 Proposed Bond
(2025-2030)

$2,360,600*

  • Flooring
  • Grounds (Track)
  • HVAC
  • Roof 
  • Emergency Communication Equipment

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Gym ceiling and basketball hoop at Walt Clark School showing exposed pipes and aging infrastructure.

The gym basketball backboards require maintenance and new motors/controls.

Worn hypalon roof with dirt buildup around drains

The school’s roof has deteriorating seams and poor drainage areas, requiring repairs to prevent leaks.

Cinder track with uneven surface and visible wear

Walt Clark Middle School’s cinder track is outdated and worn, limiting safe athletic use