Thompson School District Bond Projects

Mary Blair

Exterior view of a red brick building with trees and picnic tables in front

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Mary Blair

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$550K

  • Asphalt
  • HVAC
  • Lighting
  • Plumbing
  • Fire Protection

2018 Bond
(2018-2025)

$278K

  • Modernization

2025 Proposed Bond
(2025-2030)

$275,000*

  • Asphalt (Major)
  • Kitchen (Equipment)

*Estimated Budget. All projects and costs are subject to review and adjustments.

Example of Critical Needs

Parking lot with large cracks and potholes in the asphalt surface

Parking lot pavement is cracked and deteriorating, creating safety concerns and the need for resurfacing.