Skip To Main Content
Thompson School District Bond Projects

Support Services Center

Thompson School District Support Services building with a blue roof, surrounded by tall trees

Departments

  • Innovative Technology Services
  • Nutrition Services

2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at the Support Services Center

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$700K

  • Asphalt
  • HVAC
  • Roof
  • Security Systems
  • Fire Protection

2018 Bond
(2018-2025)

$900K

  • Flooring
  • HVAC
  • Kitchen Equipment

2025 Proposed Bond
(2025-2030)

$1,265,000*

  • Asphalt (Major)
  • HVAC (Equipment)
  • Doors/Hardware
  • Grounds (Fencing)

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Picture of damaged asphalt

Parking lot asphalt is severly damaged with drainage issues requiring replacement.

Exterior metal door with worn paint and rust starting at the bottom edges, set into a tan and white wall

Weathered exterior door shows early rust and deterioration, needing repair or replacement to maintain security and durability.