2025 Bond

2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Peakview Academy at Conrad Ball

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

$2.1M

  • Flooring
  • Asphalt
  • Fire Protection
  • Athletics
  • HVAC
  • Kitchen Equipment
  • Grounds
  • Doors/Hardware
  • Roof

2018 Bond
(2018-2025)

$26M

  • PK8 Consolidation/Renovation
  • Roof
  • Playground
  • Athletics

2025 Bond
(2025-2030)

$556K*

  • Electrical (Equipment)
  • Grounds (Turf, Track)
  • Roof (Shingles)
  • Walls (Exterior Brick)
  • Windows (Glass Block)

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

Glass block window in a brick wall with several panes showing cracks.

Cracked glass block window panes need replacement to maintain safety and weather protection.

Green playground lawn with multiple worn and bare patches in the grass.

Worn turf in the playground area requires repair to improve safety and play conditions.

Sloped roof with black shingles showing curling, lifting, and visible wear.

Aging roof shingles are curling and lifting, indicating the need for roof repair.