Riverview PK-8

2025 Bond
Your Tax Dollars at Work at Riverview PK-8
- Critical Needs
- Safety and Security
- Future Planning
2005 Bond
(2005-2012)
2018 Bond
(2018-2025)
$43.5M
- Riverview PK-8 opened
2025 Bond
(2025-2030)
$275K*
- Classroom Noise Control
- Grounds (Turf)
- Plumbing (Insulation)
Examples of Critical Needs

The kickball field has significant bare spots that need turf repair for safe play.

North wall of the science room requires upgrades to protect plumbing from freezing.
