2025 Bond projects involve repairing or removing and replacing existing materials and equipment that have been identified as high-priority needs.

Your Tax Dollars at Work at Riverview PK-8

  •   Critical Needs
  •   Safety and Security
  •   Future Planning

2005 Bond
(2005-2012)

2018 Bond
(2018-2025)

$43.5M

  • Riverview PK-8 opened

2025 Bond
(2025-2030)

$275K*

  • Classroom Noise Control
  • Grounds (Turf)
  • Plumbing (Insulation)

*Estimated Budget. All projects and costs are subject to review and adjustments.

Examples of Critical Needs

School field with large worn grass patches and bare dirt near chain-link fence.

The kickball field has significant bare spots that need turf repair for safe play.

Science Classrom showing long north wall.

North wall of the science room requires upgrades to protect plumbing from freezing.